Summarize with:

When research institutions shortlist research compliance software, the options usually fall into two groups. One is the broad research administration suite, which covers funding, proposals, awards, and compliance through a single vendor. The other is a platform designed around the work of compliance committees, from protocol submission through post-approval monitoring. Both approaches can work. The better choice depends on where the institution carries its heaviest compliance load and how well its current system supports that work.

This article presents the case for a specialized platform, identifies the situations in which a suite is the stronger fit, and explains how to test both before committing.

Why Institutions Are Reassessing Their Compliance Platforms

Few R1 or R2 institutions are buying their first system. Most already have research compliance software, and a reassessment usually begins with problems the current platform cannot resolve:

  • Reporting that depends on manual work: Leadership asks for review turnaround by committee, and staff export data into spreadsheets to answer the question.
  • Forms and workflows that are slow to change: A revised institutional policy or a new review pathway waits in a vendor queue instead of being configured by the office responsible for it.
  • Animal program information that does not align: The institutional animal care and use committee (IACUC) approves animal numbers in one application. The vivarium tracks orders, census, and per diem charges in another, and staff reconcile the two manually.
  • Workload that grows faster than staffing: Protocol volume, amendments, and reliance requests increase while coordinator headcount stays flat.

External requirements increase that pressure. Since January 20, 2020, the revised Common Rule has required U.S. institutions engaged in federally conducted or supported cooperative research to rely on a single institutional review board (IRB), with limited exceptions (45 CFR 46.114(b)). The National Institutes of Health (NIH) has expected single IRB review for most domestic multi-site studies it funds since 2018 (NIH single IRB policy). IRB offices now track the studies their own board reviews alongside studies overseen by an external IRB of record. The Food and Drug Administration (FDA) proposed a similar requirement for FDA-regulated cooperative research in 2022, and the current federal regulatory agenda lists the final rule for December 2026 (RIN 0910-AI08).

Investigator workload is also a concern. In the Federal Demonstration Partnership (FDP) 2018 Faculty Workload Survey, principal investigators estimated that 44.3 percent of their research time on federally funded projects goes to administrative requirements rather than research (FDP, 2018). Systems that require investigators to re-enter the same study details for different committees increase that burden.

How a Specialized Platform Differs From an All-in-One Suite

An all-in-one research administration suite covers the research enterprise as a whole. That typically includes funding discovery, proposal development and routing, award setup, post-award financial management, and compliance review for human subjects, animal subjects, conflict of interest, and related areas. Its main advantage is breadth across the research lifecycle.

A specialized research compliance platform starts with the protocol and the committee. It supports the review pathways, approval periods, amendments, continuing review, deviations, and post-approval monitoring that each committee manages. Coverage typically extends across human subjects, animal subjects, biosafety, stem cell research oversight (SCRO), radiation safety (RSC), chemical safety (CSC), and controlled substances (CS). Many specialized platforms also support animal facility operations.

The line between the two is not absolute. Suites include compliance modules, and specialized platforms often support research administration. The practical difference is which workflows each vendor designed first and continues to invest in most heavily. Those are the workflows that tend to be the most configurable and the most closely aligned with how committees actually operate.

Where Committee-Level Depth Matters Most

Compliance workload concentrates in a predictable set of workflows. These deserve the closest attention in any evaluation, because they determine how much manual effort the compliance office absorbs each week.

Committee-specific review pathways: An IRB moves studies through exempt determinations, expedited review, and convened review. An IACUC uses designated member review (DMR) and full committee review (FCR). An institutional biosafety committee (IBC) reviews research involving recombinant or synthetic nucleic acid molecules under the NIH Guidelines. A platform designed for committee work lets each office configure its own pathways, forms, and reviewer assignments rather than routing every committee through the same approval chain. Offices rely on fewer workarounds, and review timelines match each committee’s practice.

Completeness checks before submission: When the institution defines which protocol questions are required for each committee, the system can stop an incomplete submission before it reaches pre-review. Coordinators spend less time returning protocols for missing information, and investigators reach committee review sooner.

Approval periods, renewals and amendments: Missed expiration dates and untracked amendments create real exposure. The system tracks these dates, sends reminders to investigators and staff ahead of each deadline, and gives the compliance office a current view of what is coming due. This reduces the chance that a deadline passes unnoticed.

Animal program operations: For institutions with significant animal research, much of the reconciliation work accumulates between protocol approval and daily vivarium activity. When animal ordering, census, and per diem billing reference the approved protocol, facility staff can confirm that an order matches approved animal numbers before placing it. The IACUC and the attending veterinarian also gain visibility into activity under each protocol, and animal health records kept alongside that protocol give veterinary staff the context they need for clinical decisions.

Post-approval monitoring: Monitoring visits, findings, and corrective actions are most useful when each one links to the protocol it concerns. That link helps the compliance office identify patterns across labs and committees and demonstrate follow-through during an AAALAC International site visit or a review by the Association for the Accreditation of Human Research Protection Programs (AAHRPP).

None of these capabilities shifts responsibility. While investigators, reviewers, and staff are responsible for the review and conduct of research activities, the institution remains responsible for its human research protection program and its animal care and use program as a whole. The platform supports that oversight by keeping dates, documentation, and actions organized and traceable.

The Strongest Argument for a Suite, and How to Test It

The best case for an all-in-one suite is integration across the research lifecycle. Sponsored programs staff want to confirm that required protocol approvals are in place before award setup. Conflict of interest officers want disclosures to align with proposals and protocols. Research IT leaders prefer fewer vendor contracts and a consistent approach to identity and access. These are legitimate requirements, and for some institutions they outweigh every other consideration.

Integration is a requirement, though, and more than one architecture can meet it. A specialized platform can provide it through its own grants and conflict of interest modules or through documented interfaces with the institution’s existing grants, financial, and human resources (HR) systems. The useful question is which data has to move between functions, in which direction, how often, and which office owns each data element.

Four tests clarify how any vendor handles integration:

  • Protocol and award alignment: Ask the vendor to show how sponsored programs staff confirm IRB or IACUC approval for a specific award, and what happens when that protocol is amended or expires.
  • Personnel and training: Ask for the source of training completion data, how it reaches the protocol, and whether the system flags study personnel whose required training has lapsed.
  • Conflict of interest: Ask how disclosures relate to proposals and protocols, and which reviewers see a potential conflict.
  • Interfaces with existing systems: Ask for application programming interface (API) documentation, and for references at institutions that run the same enterprise resource planning (ERP) or grants system you do.

Integration also matters within the compliance office. A study that uses recombinant DNA in animals requires both IACUC and IBC review. Each committee follows its own form and review process, but investigators should not have to re-enter personnel and study details twice, and each committee should be able to reference the related protocol. Run this scenario with every vendor on your shortlist, whether suite or specialized.

When Each Approach Is the Right Fit

Institutions typically weigh three approaches, including the separate committee tools many still use today. Each has real strengths and real limitations.

Criteria
Specialized research compliance platform
All-in-one research administration suite
Separate tools for each committee
Design focus
Protocols and committee review across compliance areas, often including animal program operations
The full research lifecycle, from funding through award closeout
A single committee or function
Main strengths
Committee-specific configuration; depth in post-approval monitoring and animal program workflows; shared protocol data across committees
One vendor relationship; shared accounts and interface across pre-award, post-award and compliance; portfolio-level reporting
Focused functionality for one office; lower cost and faster deployment for a narrow scope
Main limitations
Integration with an external grants or ERP system requires interface work if the institution does not adopt the vendor's research administration modules
Depth of configuration varies by compliance module and needs testing committee by committee; animal facility operations may require a separate product; one contract concentrates dependence on one vendor
Duplicate data entry across committees; inconsistent reporting; more vendors, interfaces and security reviews to manage
Right fit when
Compliance workload, overlapping committee review or animal program complexity is the main driver, and the grants environment is stable
Sponsored programs modernization is the top priority, vendor consolidation is an institutional mandate, and compliance volume is moderate
One committee has a distinct need and institution-wide replacement is not yet planned

Some institutions combine approaches, keeping a suite or their ERP for sponsored programs and adopting a specialized platform for committee review. When the choice is not obvious, a useful question is which office’s workload most constrains research growth over the next five years. If the answer is sponsored programs, breadth deserves more weight. If it is the IRB, IACUC, or IBC office, committee-level depth does.

How to Evaluate Research Compliance Software Before You Commit

Rankings of the best research administration software rarely account for an institution’s own committee structure, policies, and systems. Scenario-based testing produces a more reliable answer than a feature checklist.

  • Send scenarios in advance: Give each vendor four or five scenarios drawn from your own programs two to three weeks before the demonstration. Useful examples include an animal study that also requires IBC review and an IRB study that relies on an external IRB of record. Others include an amendment that adds personnel without current training, an animal order that exceeds approved numbers, and a leadership report on review turnaround by committee over the past year.
  • Ask for a scripted demonstration: Have every vendor demonstrate the same scenarios in the same order so your team compares like with like.
  • Use a sandbox or proof of concept for the deciding criteria: Reserve hands-on testing for the two or three requirements that decide the selection, such as committee configuration or integration with your grants system.
  • Clarify who changes what: Ask which forms, questions, routing rules, and notifications your staff can configure, which changes require the vendor, and how long vendor changes typically take.
  • Resolve integration, security and migration questions before selection: Interface scope, data migration from your current system and your institution’s security review belong in the evaluation, not in the implementation plan.
  • Compare cost over five years : Include licenses, implementation, interfaces, and the staff time required to maintain configuration, not only the first-year price.
  • Talk with peer institutions: Ask references with similar research volume and committee structure what changed after go-live and what they would configure differently.

How Key Solutions Approaches Specialized Research Compliance

Key Solutions builds research compliance software for life sciences research institutions, with research administration modules and data services also available. Several characteristics distinguish its approach.

  • Committee coverage on a unified platform: Human Subjects (IRB), Animal Subjects (IACUC), Biosafety (IBC), Stem Cells (SCRO), Radiation Safety (RSC), Chemical Safety (CSC), Controlled Substances (CS), and Post-Approval Monitoring (PAM) operate on a unified platform. Each committee keeps its own forms and review process. Shared protocol data reduces duplicate entry and lets investigators reference related protocols, which helps compliance teams coordinate oversight of studies that span committees.
  • Institution-defined forms and workflows: Institutions set the questions each committee’s protocol form includes, mark them as required or optional, and configure workflows from pre-built options. Key Solutions adds institution-specific workflow steps during implementation when needed. Policy changes reach investigators through configuration rather than a system rebuild.
  • Depth in the animal care and use program: Animal Subjects (IACUC), Lab Animal Resource Software (LARS), and Lab Animal Health Software (LAHS) support protocol-linked animal ordering, census, per diem billing, and animal health records. The IACUC, facility staff, and the attending veterinarian work from aligned information instead of reconciling separate applications. [VALIDATE WITH KSI: confirm LARS checks animal orders against IACUC-approved animal numbers before this is stated as a product capability]
  • Research administration when the institution needs it: Grants Management, Post Award Grants Management and Conflict of Interest (eCOI) are available on the same platform, including system-to-system (S2S) submission to Grants.gov. APIs support integration with existing HR, financial, and ERP systems, so institutions that keep their current grants environment can still align it with compliance. [VALIDATE WITH KSI: confirm institutions can adopt compliance modules first and add research administration modules later]
  • Data and AI services kept distinct from product features: Key Solutions Professional Consulting Services (PCS) delivers data analytics, data infrastructure, and artificial intelligence and machine learning (AI/ML) services as separate engagements. Engagements typically start with an assessment of data and system readiness. Institutions get a prioritized roadmap for analytics and responsible AI on their compliance data before committing to specific use cases. [VALIDATE WITH KSI: confirm the public name of the AI readiness assessment and that it is the recommended starting point; it is not yet listed on keyusa.com/professional-services]

15+ Years Focused on Life Sciences Research · ISO 27001:2022 Certified · Built for Complex Research Environments

If your institution is weighing a specialized platform against a suite, schedule a working session with our team.

Talk to an Expert

‍

Frequently Asked Questions

Neither approach is better for every institution. A purpose-built platform generally suits institutions where compliance committees carry the heaviest workload, where several committees review overlapping research, or where the animal care and use program depends on aligned protocol and facility information. A suite generally suits institutions whose priority is modernizing sponsored programs or reducing the number of vendors. Because most institutions are replacing an existing system, the more practical question is which gaps in the current platform create the most risk and staff effort. The approach that closes those gaps in your own scenarios is the better choice.

For R1 and R2 institutions, scale changes the criteria. Look for consistent performance under high protocol volume, support for several committees reviewing overlapping research, and reporting that compares turnaround across committees without manual compilation. Confirm that your own staff can change forms and routing as policies evolve, because vendor-dependent changes become a bottleneck at scale. If your institution operates multiple campuses or regularly relies on external IRBs, include those situations in your evaluation scenarios. The best research administration software for your institution is the option that performs well on scenarios drawn from your own programs.

Yes, provided the vendor offers documented interfaces, and the institution defines what needs to move between systems. Integration typically takes one of three forms: the vendor’s own grants and conflict of interest modules, real-time interfaces through documented APIs, or scheduled data exchanges. Each form requires decisions about which system owns each data element, such as personnel, training status, and award numbers. It also requires a plan for maintaining the interface when either system is upgraded. Ask vendors how customers that run your ERP or grants system have managed those upgrades.

Not necessarily. Some specialized platforms also offer grants management and conflict of interest modules, so an institution can expand on the same platform over time. If the institution keeps a separate grants or ERP system, it manages two vendor relationships and the interface between them. That trade-off is reasonable when committee-level depth reduces daily compliance workload and supports stronger oversight. Institutions with a firm vendor consolidation mandate should state that requirement explicitly in their evaluation criteria, so every option is scored against it from the start.

Separate three things that vendors often present together: capabilities available in the product today, reporting and analytics built on product data, and custom AI or data work delivered as a service. For each claim, ask what data it uses, who reviews its output, and how the institution validates results before relying on them. AI can help staff find patterns in review timelines or monitoring findings, but committees and institutional officials remain accountable for every determination. An assessment of data quality and system readiness is usually the right first step before investing in specific use cases.

‍

Summarize with:

When research institutions shortlist research compliance software, the options usually fall into two groups. One is the broad research administration suite, which covers funding, proposals, awards, and compliance through a single vendor. The other is a platform designed around the work of compliance committees, from protocol submission through post-approval monitoring. Both approaches can work. The better choice depends on where the institution carries its heaviest compliance load and how well its current system supports that work.

This article presents the case for a specialized platform, identifies the situations in which a suite is the stronger fit, and explains how to test both before committing.

Why Institutions Are Reassessing Their Compliance Platforms

Few R1 or R2 institutions are buying their first system. Most already have research compliance software, and a reassessment usually begins with problems the current platform cannot resolve:

  • Reporting that depends on manual work: Leadership asks for review turnaround by committee, and staff export data into spreadsheets to answer the question.
  • Forms and workflows that are slow to change: A revised institutional policy or a new review pathway waits in a vendor queue instead of being configured by the office responsible for it.
  • Animal program information that does not align: The institutional animal care and use committee (IACUC) approves animal numbers in one application. The vivarium tracks orders, census, and per diem charges in another, and staff reconcile the two manually.
  • Workload that grows faster than staffing: Protocol volume, amendments, and reliance requests increase while coordinator headcount stays flat.

External requirements increase that pressure. Since January 20, 2020, the revised Common Rule has required U.S. institutions engaged in federally conducted or supported cooperative research to rely on a single institutional review board (IRB), with limited exceptions (45 CFR 46.114(b)). The National Institutes of Health (NIH) has expected single IRB review for most domestic multi-site studies it funds since 2018 (NIH single IRB policy). IRB offices now track the studies their own board reviews alongside studies overseen by an external IRB of record. The Food and Drug Administration (FDA) proposed a similar requirement for FDA-regulated cooperative research in 2022, and the current federal regulatory agenda lists the final rule for December 2026 (RIN 0910-AI08).

Investigator workload is also a concern. In the Federal Demonstration Partnership (FDP) 2018 Faculty Workload Survey, principal investigators estimated that 44.3 percent of their research time on federally funded projects goes to administrative requirements rather than research (FDP, 2018). Systems that require investigators to re-enter the same study details for different committees increase that burden.

How a Specialized Platform Differs From an All-in-One Suite

An all-in-one research administration suite covers the research enterprise as a whole. That typically includes funding discovery, proposal development and routing, award setup, post-award financial management, and compliance review for human subjects, animal subjects, conflict of interest, and related areas. Its main advantage is breadth across the research lifecycle.

A specialized research compliance platform starts with the protocol and the committee. It supports the review pathways, approval periods, amendments, continuing review, deviations, and post-approval monitoring that each committee manages. Coverage typically extends across human subjects, animal subjects, biosafety, stem cell research oversight (SCRO), radiation safety (RSC), chemical safety (CSC), and controlled substances (CS). Many specialized platforms also support animal facility operations.

The line between the two is not absolute. Suites include compliance modules, and specialized platforms often support research administration. The practical difference is which workflows each vendor designed first and continues to invest in most heavily. Those are the workflows that tend to be the most configurable and the most closely aligned with how committees actually operate.

Where Committee-Level Depth Matters Most

Compliance workload concentrates in a predictable set of workflows. These deserve the closest attention in any evaluation, because they determine how much manual effort the compliance office absorbs each week.

Committee-specific review pathways: An IRB moves studies through exempt determinations, expedited review, and convened review. An IACUC uses designated member review (DMR) and full committee review (FCR). An institutional biosafety committee (IBC) reviews research involving recombinant or synthetic nucleic acid molecules under the NIH Guidelines. A platform designed for committee work lets each office configure its own pathways, forms, and reviewer assignments rather than routing every committee through the same approval chain. Offices rely on fewer workarounds, and review timelines match each committee’s practice.

Completeness checks before submission: When the institution defines which protocol questions are required for each committee, the system can stop an incomplete submission before it reaches pre-review. Coordinators spend less time returning protocols for missing information, and investigators reach committee review sooner.

Approval periods, renewals and amendments: Missed expiration dates and untracked amendments create real exposure. The system tracks these dates, sends reminders to investigators and staff ahead of each deadline, and gives the compliance office a current view of what is coming due. This reduces the chance that a deadline passes unnoticed.

Animal program operations: For institutions with significant animal research, much of the reconciliation work accumulates between protocol approval and daily vivarium activity. When animal ordering, census, and per diem billing reference the approved protocol, facility staff can confirm that an order matches approved animal numbers before placing it. The IACUC and the attending veterinarian also gain visibility into activity under each protocol, and animal health records kept alongside that protocol give veterinary staff the context they need for clinical decisions.

Post-approval monitoring: Monitoring visits, findings, and corrective actions are most useful when each one links to the protocol it concerns. That link helps the compliance office identify patterns across labs and committees and demonstrate follow-through during an AAALAC International site visit or a review by the Association for the Accreditation of Human Research Protection Programs (AAHRPP).

None of these capabilities shifts responsibility. While investigators, reviewers, and staff are responsible for the review and conduct of research activities, the institution remains responsible for its human research protection program and its animal care and use program as a whole. The platform supports that oversight by keeping dates, documentation, and actions organized and traceable.

The Strongest Argument for a Suite, and How to Test It

The best case for an all-in-one suite is integration across the research lifecycle. Sponsored programs staff want to confirm that required protocol approvals are in place before award setup. Conflict of interest officers want disclosures to align with proposals and protocols. Research IT leaders prefer fewer vendor contracts and a consistent approach to identity and access. These are legitimate requirements, and for some institutions they outweigh every other consideration.

Integration is a requirement, though, and more than one architecture can meet it. A specialized platform can provide it through its own grants and conflict of interest modules or through documented interfaces with the institution’s existing grants, financial, and human resources (HR) systems. The useful question is which data has to move between functions, in which direction, how often, and which office owns each data element.

Four tests clarify how any vendor handles integration:

  • Protocol and award alignment: Ask the vendor to show how sponsored programs staff confirm IRB or IACUC approval for a specific award, and what happens when that protocol is amended or expires.
  • Personnel and training: Ask for the source of training completion data, how it reaches the protocol, and whether the system flags study personnel whose required training has lapsed.
  • Conflict of interest: Ask how disclosures relate to proposals and protocols, and which reviewers see a potential conflict.
  • Interfaces with existing systems: Ask for application programming interface (API) documentation, and for references at institutions that run the same enterprise resource planning (ERP) or grants system you do.

Integration also matters within the compliance office. A study that uses recombinant DNA in animals requires both IACUC and IBC review. Each committee follows its own form and review process, but investigators should not have to re-enter personnel and study details twice, and each committee should be able to reference the related protocol. Run this scenario with every vendor on your shortlist, whether suite or specialized.

When Each Approach Is the Right Fit

Institutions typically weigh three approaches, including the separate committee tools many still use today. Each has real strengths and real limitations.

Criteria
Specialized research compliance platform
All-in-one research administration suite
Separate tools for each committee
Design focus
Protocols and committee review across compliance areas, often including animal program operations
The full research lifecycle, from funding through award closeout
A single committee or function
Main strengths
Committee-specific configuration; depth in post-approval monitoring and animal program workflows; shared protocol data across committees
One vendor relationship; shared accounts and interface across pre-award, post-award and compliance; portfolio-level reporting
Focused functionality for one office; lower cost and faster deployment for a narrow scope
Main limitations
Integration with an external grants or ERP system requires interface work if the institution does not adopt the vendor's research administration modules
Depth of configuration varies by compliance module and needs testing committee by committee; animal facility operations may require a separate product; one contract concentrates dependence on one vendor
Duplicate data entry across committees; inconsistent reporting; more vendors, interfaces and security reviews to manage
Right fit when
Compliance workload, overlapping committee review or animal program complexity is the main driver, and the grants environment is stable
Sponsored programs modernization is the top priority, vendor consolidation is an institutional mandate, and compliance volume is moderate
One committee has a distinct need and institution-wide replacement is not yet planned

Some institutions combine approaches, keeping a suite or their ERP for sponsored programs and adopting a specialized platform for committee review. When the choice is not obvious, a useful question is which office’s workload most constrains research growth over the next five years. If the answer is sponsored programs, breadth deserves more weight. If it is the IRB, IACUC, or IBC office, committee-level depth does.

How to Evaluate Research Compliance Software Before You Commit

Rankings of the best research administration software rarely account for an institution’s own committee structure, policies, and systems. Scenario-based testing produces a more reliable answer than a feature checklist.

  • Send scenarios in advance: Give each vendor four or five scenarios drawn from your own programs two to three weeks before the demonstration. Useful examples include an animal study that also requires IBC review and an IRB study that relies on an external IRB of record. Others include an amendment that adds personnel without current training, an animal order that exceeds approved numbers, and a leadership report on review turnaround by committee over the past year.
  • Ask for a scripted demonstration: Have every vendor demonstrate the same scenarios in the same order so your team compares like with like.
  • Use a sandbox or proof of concept for the deciding criteria: Reserve hands-on testing for the two or three requirements that decide the selection, such as committee configuration or integration with your grants system.
  • Clarify who changes what: Ask which forms, questions, routing rules, and notifications your staff can configure, which changes require the vendor, and how long vendor changes typically take.
  • Resolve integration, security and migration questions before selection: Interface scope, data migration from your current system and your institution’s security review belong in the evaluation, not in the implementation plan.
  • Compare cost over five years : Include licenses, implementation, interfaces, and the staff time required to maintain configuration, not only the first-year price.
  • Talk with peer institutions: Ask references with similar research volume and committee structure what changed after go-live and what they would configure differently.

How Key Solutions Approaches Specialized Research Compliance

Key Solutions builds research compliance software for life sciences research institutions, with research administration modules and data services also available. Several characteristics distinguish its approach.

  • Committee coverage on a unified platform: Human Subjects (IRB), Animal Subjects (IACUC), Biosafety (IBC), Stem Cells (SCRO), Radiation Safety (RSC), Chemical Safety (CSC), Controlled Substances (CS), and Post-Approval Monitoring (PAM) operate on a unified platform. Each committee keeps its own forms and review process. Shared protocol data reduces duplicate entry and lets investigators reference related protocols, which helps compliance teams coordinate oversight of studies that span committees.
  • Institution-defined forms and workflows: Institutions set the questions each committee’s protocol form includes, mark them as required or optional, and configure workflows from pre-built options. Key Solutions adds institution-specific workflow steps during implementation when needed. Policy changes reach investigators through configuration rather than a system rebuild.
  • Depth in the animal care and use program: Animal Subjects (IACUC), Lab Animal Resource Software (LARS), and Lab Animal Health Software (LAHS) support protocol-linked animal ordering, census, per diem billing, and animal health records. The IACUC, facility staff, and the attending veterinarian work from aligned information instead of reconciling separate applications. [VALIDATE WITH KSI: confirm LARS checks animal orders against IACUC-approved animal numbers before this is stated as a product capability]
  • Research administration when the institution needs it: Grants Management, Post Award Grants Management and Conflict of Interest (eCOI) are available on the same platform, including system-to-system (S2S) submission to Grants.gov. APIs support integration with existing HR, financial, and ERP systems, so institutions that keep their current grants environment can still align it with compliance. [VALIDATE WITH KSI: confirm institutions can adopt compliance modules first and add research administration modules later]
  • Data and AI services kept distinct from product features: Key Solutions Professional Consulting Services (PCS) delivers data analytics, data infrastructure, and artificial intelligence and machine learning (AI/ML) services as separate engagements. Engagements typically start with an assessment of data and system readiness. Institutions get a prioritized roadmap for analytics and responsible AI on their compliance data before committing to specific use cases. [VALIDATE WITH KSI: confirm the public name of the AI readiness assessment and that it is the recommended starting point; it is not yet listed on keyusa.com/professional-services]

15+ Years Focused on Life Sciences Research · ISO 27001:2022 Certified · Built for Complex Research Environments

If your institution is weighing a specialized platform against a suite, schedule a working session with our team.

Talk to an Expert

‍

Frequently Asked Questions

Neither approach is better for every institution. A purpose-built platform generally suits institutions where compliance committees carry the heaviest workload, where several committees review overlapping research, or where the animal care and use program depends on aligned protocol and facility information. A suite generally suits institutions whose priority is modernizing sponsored programs or reducing the number of vendors. Because most institutions are replacing an existing system, the more practical question is which gaps in the current platform create the most risk and staff effort. The approach that closes those gaps in your own scenarios is the better choice.

For R1 and R2 institutions, scale changes the criteria. Look for consistent performance under high protocol volume, support for several committees reviewing overlapping research, and reporting that compares turnaround across committees without manual compilation. Confirm that your own staff can change forms and routing as policies evolve, because vendor-dependent changes become a bottleneck at scale. If your institution operates multiple campuses or regularly relies on external IRBs, include those situations in your evaluation scenarios. The best research administration software for your institution is the option that performs well on scenarios drawn from your own programs.

Yes, provided the vendor offers documented interfaces, and the institution defines what needs to move between systems. Integration typically takes one of three forms: the vendor’s own grants and conflict of interest modules, real-time interfaces through documented APIs, or scheduled data exchanges. Each form requires decisions about which system owns each data element, such as personnel, training status, and award numbers. It also requires a plan for maintaining the interface when either system is upgraded. Ask vendors how customers that run your ERP or grants system have managed those upgrades.

Not necessarily. Some specialized platforms also offer grants management and conflict of interest modules, so an institution can expand on the same platform over time. If the institution keeps a separate grants or ERP system, it manages two vendor relationships and the interface between them. That trade-off is reasonable when committee-level depth reduces daily compliance workload and supports stronger oversight. Institutions with a firm vendor consolidation mandate should state that requirement explicitly in their evaluation criteria, so every option is scored against it from the start.

Separate three things that vendors often present together: capabilities available in the product today, reporting and analytics built on product data, and custom AI or data work delivered as a service. For each claim, ask what data it uses, who reviews its output, and how the institution validates results before relying on them. AI can help staff find patterns in review timelines or monitoring findings, but committees and institutional officials remain accountable for every determination. An assessment of data quality and system readiness is usually the right first step before investing in specific use cases.

‍