The main alternatives to InfoEd are broad research administration suites such as Cayuse, Huron Research Suite and Kuali Research, and compliance-focused platforms such as eProtocol by Key Solutions. Some institutions also keep InfoEd for sponsored programs and replace only the compliance modules. The right choice depends on which offices have the problem.
InfoEd Global has supplied electronic research administration (eRA) software to colleges and universities for more than two decades. Institutions use it across the sponsored projects lifecycle, from proposal development and proposal tracking to subawards and post-award management, and many also run its compliance modules for human subjects, animal research, biosafety and conflict of interest. Its SPIN database is widely used for funding discovery.
That breadth is the reason institutions rarely replace InfoEd all at once. This page is for research administration and compliance directors weighing their options. It explains why institutions look at InfoEd alternatives, the three realistic paths, what to evaluate, and where Key Solutions fits.
Why institutions look at InfoEd alternatives
Most evaluations start with one office, not the whole system:
- The compliance offices want more depth : An IRB or IACUC office may need committee-specific workflows, meeting management or post-approval monitoring beyond what the current configuration provides.
- Implementation has been phased for years : Many institutions rolled out InfoEd module by module. When some modules are still planned or partly used, offices run parallel processes in the meantime.
- Configuration depends on outside help : Form and routing changes that need vendor or consultant time make it slow to reflect new policy.
- Reporting takes manual work : Leadership wants turnaround, workload and portfolio data without staff exporting and combining it by hand.
- Contract renewal : A renewal is a natural time to test the market, even if the current system is working.
None of these means InfoEd is the wrong system. They are reasons to check whether the current setup still fits the program.
Three ways to replace or reduce InfoEd
Institutions usually choose between three approaches. Each one is the right answer for some programs. Our guide on unified platform or add-on compliance modules covers the trade-off in more depth.
The suite option suits a sponsored programs office that wants to modernize alongside compliance. The compliance-platform option suits institutions where proposals and awards run well but committee offices carry the strain. Staying put is often right when the problem is a dated configuration rather than the product itself.
What to evaluate
Whichever path you take, test every option against the same criteria.
Send each vendor your own scenarios in advance, ask for a scripted demonstration, and use a sandbox or proof-of-concept phase for the criteria that matter most. Resolve integration, security and workflow gaps before selection, not during implementation. Our list of strategic questions before selecting compliance software is a useful starting checklist.
Where Key Solutions fits as an InfoEd alternative
eProtocol by Key Solutions is a research compliance and research administration platform. It is usually considered in the second path: replacing compliance modules while sponsored programs keep their current system. Institutions can also use it for grants.
Research compliance : Human Subjects (IRB), Animal Subjects (IACUC), Biosafety (IBC), Stem Cells (SCRO), Radiation Safety (RSC), Chemical Safety (CSC), Controlled Substances (CS) and Post-Approval Monitoring (PAM) each keep their own forms and review workflow. Investigators can reference details from related protocols instead of re-entering them. IRB capabilities include dynamic smart forms that flag compliance issues, automated routing and notifications, automatic agendas and minutes, automatic protocol versioning, renewal reminders and real-time status dashboards.
Animal research operations : Lab Animal Resources Software (LARS) and Lab Animal Health Software (LAHS) work alongside the IACUC module, so animal ordering, census, per diem billing and health records draw on approved protocol data.
Conflict of interest : Conflict of Interest (eCOI) automates the disclosure lifecycle, routes disclosures to reviewers and links COI reviews to the related protocol records.
Grants : Grants Management supports pre-award budget preparation, routing and approvals, validation against sponsor rules, and submission to Grants.gov and Research.gov. Post Award Grants Management supports financial reporting, compliance tracking and subawards.
Integration and services : The platform integrates with HR and finance systems through an open architecture, and the IRB module lists CTMS, EHR and LIMS integration. Professional and Consulting Services (PCS) provides implementation, data migration, data analytics and hosting support.
Explore the research compliance, IRB software, Grants Management and research administration software pages for module detail.
When Key Solutions is not the best fit : If your institution wants one vendor across every research office, including technology transfer and agreements, a broad research administration suite may serve you better. If InfoEd works well for compliance and your issues sit only in post-award finance, focus the evaluation there instead.
Planning the move
The biggest risk in any eRA change is disruption to work in progress. A few steps reduce it:
- Decide the boundary first : Agree which offices move and which stay, and design the integration between them before selection.
- Plan around approval periods : Schedule cutover so no protocol is due for continuing review or renewal in the transition window.
- Agree what migrates : Active protocols, approval history and approved documents usually move; closed records need a retrieval plan for audits.
- Configure to current policy : Use the move to reflect today's policy rather than reproducing legacy forms question by question.
- Train by role : Investigators, coordinators, reviewers and committee members each need training on their own tasks.
Measuring whether the change worked
Agree on success measures before you sign, and record a baseline from your current InfoEd data. Useful measures include median days to approval by review type, the share of submissions returned at pre-review, renewals approved before the approval period ends, proposals that meet the internal deadline, and staff hours spent on quarterly reports. Review them at 6, 12 and 24 months.
If you keep InfoEd for sponsored programs, add one integration measure: how often protocol approvals and COI determinations reach award setup without manual follow-up. That number shows whether the boundary between the two systems is working, and it gives both offices a shared view of the handoff.
Our guide to IRB system transition covers rollout planning in more detail.


